Carbon dioxide capture — Part 2: Evaluation procedure to assure and maintain stable performance of post-combustion CO 2 capture plant integrated with a power plant

Oct 1, 2021

General information

60.60     Oct 1, 2021

ISO

ISO/TC 265

International Standard

13.020.40  

English   French  

Buying

Published

Language in which you want to receive the document

Scope

This document provides definitions, guidelines and supporting information for evaluating and reporting (with respect to the basic design items ongoing, and the operational results of a reference plant or unit as feedback) to ensure the (designed) performance of a PCC plant integrated with a host power plant. The PCC plant separates CO2 from the power plant flue gas in preparation for subsequent transportation and geological storage. The physical system being addressed is a single power plant, with an optional auxiliary unit to provide thermal energy required for the PCC plant, and a single PCC plant as described in ISO 27919-1.
The formulas and methods to assure and maintain reliable performance, presented in this document, describe issues addressed during the design and construction phases and practices that document reliability and availability during routine operation. These practices would also guide ongoing maintenance programmes.
This document does not provide guidelines for benchmark, comparison or assessment studies for PCC plant operations using different capture technologies (i.e. absorbents), nor does it specify appropriate operating conditions such as temperature etc.

Life cycle

NOW