Bulgarian Institute for Standardization
Standards – always a step ahead
Phone: +359 2 8174 523, +359 2 8174 504
E-mail: info@bds-bg.org
1797 Sofia, 13 "Lachezar Stanchev" Str., "Izgrev" Complex
ID number: 175079183, VAT number: BG175079183
Main menu

БДС ISO 7870-2:2015

Control charts — Part 2: Shewhart control charts

Jan 18, 2016
May 18, 2020

General information

90.92     Mar 5, 2021

BDS

ТК-12

International Standard

03.120.30  

English   Bulgarian  

Buying

Published

Language in which you want to receive the document

Scope

ISO 7870-2:2013 establishes a guide to the use and understanding of the Shewhart control chart approach to the methods for statistical control of a process.
ISO 7870-2:2013 is limited to the treatment of statistical process control methods using only the Shewhart system of charts. Some supplementary material that is consistent with the Shewhart approach, such as the use of warning limits, analysis of trend patterns and process capability is briefly introduced. There are, however, several other types of control chart procedures, a general description of which can be found in ISO 7870-1.

Life cycle

NOW

PUBLISHED
БДС ISO 7870-2:2015
90.92 Standard to be revised
Mar 5, 2021

REVISED BY

IN DEVELOPMENT
prБДС ISO 7870-2:2022

Related project

Adopted from ISO 7870-2:2013