To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.
Execution of special geotechnical work - Sheet pile walls, combined pile walls, high modulus walls
60.55 Ratification completed (DOR)
Earthworks - Chemical tests - Part 1: Determination of loss on ignition
60.55 Ratification completed (DOR)
Eurocode 7 - Geotechnical design - Part 2: Ground properties
40.60 Close of voting
Eurocode 7 - Geotechnical design - Part 3: Geotechnical structures
40.60 Close of voting
Geotechnical investigation and testing - Geotechnical monitoring by field instrumentation - Part 8: Measurement of forces: Load cells (ISO/DIS 18674-8:2022)
40.60 Close of voting
Geotechnical investigation and testing - Field testing - Part 1: Electrical cone and piezocone penetration test (ISO 22476-1:2022)
60.55 Ratification completed (DOR)
Geotechnical investigation and testing — Field testing – Part 16: Borehole shear test
30.99 CD approved for registration as DIS
Geotechnical investigation and testing - Field testing - Part 5: Prebored pressuremeter test (ISO/FDIS 22476-5:2022)
60.55 Ratification completed (DOR)
Geotechnical investigation and testing - Testing of geotechnical structures - Part 2: Testing of piles: static tension load testing (ISO/DIS 22477-2:2022)
45.99 Dispatch of FV draft to CCMC
90.93 Standard confirmed
90.93 Standard confirmed
90.93 Standard confirmed
90.93 Standard confirmed
90.60 Close of review
90.93 Standard confirmed
90.93 Standard confirmed
90.93 Standard confirmed