To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.
Test methods for determining the contribution to the fire resistance of structural members - Part 7: Applied protection to timber members
40.10 harmonizedStageCodeLabel.40.10
Fire classification of construction products and building elements - Part 3: Classification using data from fire resistance tests on products and elements used in building service installations: fire resisting ventilation ducts and fire dampers and/or power, control and communication cables
40.60 Close of voting
Fire resistance tests for non-loadbearing elements - Part 6: Cavity barriers
40.60 Close of voting
Fire resistance tests for service installations - Part 10: Smoke control dampers
40.60 Close of voting
Fire resistance tests for device installations - Part 14: Partial penetration seals
30.99 CD approved for registration as DIS
prEN 1366-15 ‘Fire resistance tests for service installations - Part 15: 1-, 2-, 3- sided ducts’
40.20 DIS ballot initiated
Fire resistance tests for service installations - Part 3: Penetration seals
40.10 harmonizedStageCodeLabel.40.10
Fire resistance tests for service installations - Part 8: Smoke extraction ducts
40.60 Close of voting
Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts
40.60 Close of voting
Extended application of results from fire resistance tests - Part 12: Loadbearing masonry walls
40.60 Close of voting
Extended application of test results for fire resistance and/or smoke control for door, shutter and openable window assemblies, including their elements of building hardware - Part 2: Fire resistance of hinged and pivoted steel doorsets
40.60 Close of voting
'Extended application of test results for fire resistance and/or smoke control for door, shutter and openable window assemblies, including their elements of building hardware - Part 4: Fire resistance of hinged and pivoted glass doorsets'
40.60 Close of voting
Flexible sheets for waterproofing - Underlays for discontinuous roof coverings and walls - Instructions for mounting and fixing for reaction to fire testing
60.55 Ratification completed (DOR)
Eurocode 1 - Actions on structures – Part 1-2: Actions on structures exposed to fire
50.60 Close of voting. Proof returned by secretariat
Eurocode 3 - Design of steel structures - Part 1-2: Structural fire design
50.60 Close of voting. Proof returned by secretariat
Eurocode 4 - Design of composite steel and concrete structures - Part 1-2: Structural fire design
40.10 harmonizedStageCodeLabel.40.10
Eurocode 5 - Design of timber structures - Part 1-2: Structural fire design
40.20 DIS ballot initiated
Eurocode 6 - Design of masonry structures - Part 1-2: Structural fire design
45.99 Dispatch of FV draft to CCMC