Bulgarian Institute for Standardization
Standards – always a step ahead
Phone: +359 2 8174 523, +359 2 8174 504
E-mail: info@bds-bg.org
1797 Sofia, 13 "Lachezar Stanchev" Str., "Izgrev" Complex
ID number: 175079183, VAT number: BG175079183
Main menu

Projects and standards

To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.

Test methods for determining the contribution to the fire resistance of structural members - Part 7: Applied protection to timber members

40.10 harmonizedStageCodeLabel.40.10

ТК-1 more

Fire classification of construction products and building elements - Part 3: Classification using data from fire resistance tests on products and elements used in building service installations: fire resisting ventilation ducts and fire dampers and/or power, control and communication cables

40.60 Close of voting

ТК-1 more

Fire resistance tests for non-loadbearing elements - Part 6: Cavity barriers

40.60 Close of voting

ТК-1 more

Fire resistance tests for service installations - Part 10: Smoke control dampers

40.60 Close of voting

ТК-1 more

Fire resistance tests for device installations - Part 14: Partial penetration seals

30.99 CD approved for registration as DIS

ТК-1 more

prEN 1366-15 ‘Fire resistance tests for service installations - Part 15: 1-, 2-, 3- sided ducts’

40.20 DIS ballot initiated

ТК-1 more

Fire resistance tests for service installations - Part 3: Penetration seals

40.10 harmonizedStageCodeLabel.40.10

ТК-1 more

Fire resistance tests for service installations - Part 8: Smoke extraction ducts

40.60 Close of voting

ТК-1 more

Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts

40.60 Close of voting

ТК-1 more

Extended application of results from fire resistance tests - Part 12: Loadbearing masonry walls

40.60 Close of voting

ТК-1 more

Extended application of test results for fire resistance and/or smoke control for door, shutter and openable window assemblies, including their elements of building hardware - Part 2: Fire resistance of hinged and pivoted steel doorsets

40.60 Close of voting

ТК-1 more

'Extended application of test results for fire resistance and/or smoke control for door, shutter and openable window assemblies, including their elements of building hardware - Part 4: Fire resistance of hinged and pivoted glass doorsets'

40.60 Close of voting

ТК-1 more

Flexible sheets for waterproofing - Underlays for discontinuous roof coverings and walls - Instructions for mounting and fixing for reaction to fire testing

60.55 Ratification completed (DOR)

ТК-61 more

Eurocode 1 - Actions on structures – Part 1-2: Actions on structures exposed to fire

50.60 Close of voting. Proof returned by secretariat

ТК-56 more

Eurocode 3 - Design of steel structures - Part 1-2: Structural fire design

50.60 Close of voting. Proof returned by secretariat

ТК-56 more

Eurocode 4 - Design of composite steel and concrete structures - Part 1-2: Structural fire design

40.10 harmonizedStageCodeLabel.40.10

ТК-56 more

Eurocode 5 - Design of timber structures - Part 1-2: Structural fire design

40.20 DIS ballot initiated

ТК-56 more

Eurocode 6 - Design of masonry structures - Part 1-2: Structural fire design

45.99 Dispatch of FV draft to CCMC

ТК-56 more