To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.
Playground equipment and surfacing - Part 1: General safety requirements and test methods
40.60 Close of voting
Playground equipment and surfacing - Part 10: Additional specific safety requirements and test methods for fully enclosed play equipment
60.55 Ratification completed (DOR)
Impact attenuating playground surfacing - Methods of test for determination of impact attenuation
40.60 Close of voting
Gymnastic equipment - Horses and bucks - Functional and safety requirements, test methods
40.20 DIS ballot initiated
Surfaces for sports areas - Test method for the determination of tensile properties of synthetic sports surfaces
60.55 Ratification completed (DOR)
Artificial climbing structures - Part 4 - Safety requirements and test methods for safety surfaces
10.99 New project approved
Surfaces for sports areas - Test methods for the determination of vertical water infiltration and horizontal water flow rates
60.55 Ratification completed (DOR)
Mountaineering equipment - Ice-tools - Safety requirements and test methods
50.60 Close of voting. Proof returned by secretariat
Spectator facilities - Part 10: Calculating of safe capacity in case of emergency
40.20 DIS ballot initiated
Spectator facilities - Part 4: Seats - Product characteristics
60.55 Ratification completed (DOR)
Swimming pool equipment - Part 1: General safety requirements and test methods for equipment installed in pools for public use
30.99 CD approved for registration as DIS
Swimming pool equipment - Part 11: Additional specific safety requirements and test methods for moveable pool floors and moveable bulkheads installed in pools for public use
60.55 Ratification completed (DOR)
Swimming pool equipment - Part 2: Additional specific safety requirements and test methods for ladders, stepladders and handle bends
50.60 Close of voting. Proof returned by secretariat
Safety of amusement rides and amusement devices - Part 1: Design and manufacture
20.60 Close of comment period
Safety of amusement rides and amusement devices - Part 2: Operation, maintenance and use
20.60 Close of comment period
Safety of amusement rides and amusement devices - Part 3: Requirements for inspection during design, manufacture, operation and use
20.60 Close of comment period
Surfaces for sports areas - Multi-sports floor systems for indoor use - Part 1: Essential characteristics
60.55 Ratification completed (DOR)
Surfaces for sports areas - Multi-sports floor systems for indoor use - Part 2: Specifications
60.55 Ratification completed (DOR)