To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.
Guarantees of Origin related to energy - Guarantees of Origin for Electricity, gaseous hydrocarbons, Hydrogen, and heating & cooling
40.20 DIS ballot initiated
Energy Performance Contracts - Minimum requirements
60.55 Ratification completed (DOR)
High-Voltage switchgear and controlgear - Insulating pressurised partitions for gas filled metal enclosures
60.55 Ratification completed (DOR)
Electrical equipment for furnaces and ancillary equipment - Part 1: Requirements for application design and installation
40.60 Close of voting
Electrical equipment for furnaces and ancillary equipment - Part 2: Requirements for design, development and type approval of safety devices and subsystems
10.99 New project approved
Voltage characteristics of electricity supplied by public electricity networks
60.55 Ratification completed (DOR)
High-voltage switchgear and controlgear - Gas-filled compartments of AC switchgear and controlgear with rated voltages above 1 kV up to and including 52 kV
60.55 Ratification completed (DOR)
Outdoor bushings for 24 kV and 36 kV and for 5 kA and 8 kA, for liquid filled transformers
60.55 Ratification completed (DOR)
Electrical insulating protective clothing for low-voltage installations
50.60 Close of voting. Proof returned by secretariat
Overhead electrical lines exceeding AC 1 kV - Part 2-1: National Normative Aspects (NNAs) for Austria (based on EN 50341-1:2012)
60.55 Ratification completed (DOR)
Live Working - Electrically insulating helmets for use on low and medium voltage installations
45.99 Dispatch of FV draft to CCMC
Electricity metering equipment - Part 4: Particular requirements - Static meters for DC active energy (class indexes A, B, C)
40.60 Close of voting
Insulating ladders for use on or near low voltage electrical installations
50.60 Close of voting. Proof returned by secretariat
Requirements for generating plants to be connected in parallel with distribution networks - Part 1: Connection to a LV distribution network - Generating plants up to and including Type B
20.60 Close of comment period
Requirements for generating plants to be connected in parallel with distribution networks - Part 10: Tests for conformity assessment of generating units
60.55 Ratification completed (DOR)
Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network - Generating plants up to and including Type B
20.60 Close of comment period