To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.
Playground equipment and surfacing - Part 1: General safety requirements and test methods
40.60 Close of voting
Playground equipment and surfacing - Part 10: Additional specific safety requirements and test methods for fully enclosed play equipment
50.20 Proof sent to secretariat or FDIS ballot initiated
Impact attenuating playground surfacing - Methods of test for determination of impact attenuation
40.60 Close of voting
Wood preservatives - Determination of preventive action against Reticulitermes species (European termites) (Laboratory method)
10.99 New project approved
Conveying, spraying and placing machines for concrete and mortar - Safety requirements
00.60 Close of review
Adhesives for ceramic tiles - Part 1: Essential characteristics and AVCP
60.55 Ratification completed (DOR)
Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements
40.20 DIS ballot initiated
Execution of special geotechnical work - Sheet pile walls, combined pile walls, high modulus walls
60.55 Ratification completed (DOR)
Cranes safety - Requirements for health and safety - Part 2: Limiting and indicating devices
40.10 harmonizedStageCodeLabel.40.10
Railway applications - Axleboxes - Rolling bearings
20.60 Close of comment period
Railway applications - Axleboxes - Lubricating greases
20.60 Close of comment period
Railway applications - Axleboxes - Performance testing
20.60 Close of comment period
Fixed firefighting systems - Components for gas extinguishing systems - Part 13: Characteristics for check valves and non-return valves
40.60 Close of voting
Fixed firefighting systems - Components for gas extinguishing systems - Part 8: Characteristics for connectors
50.20 Proof sent to secretariat or FDIS ballot initiated
Resilient floor coverings - Agglomerated cork underlays - Specification
10.99 New project approved
Resilient floor coverings - Cork floor tiles - Specification
60.55 Ratification completed (DOR)
Tunnel boring machines - Air locks - Part 1: requirements for air locks utilising compressed air as the pressurising or breathing medium along with requirements for oxygen breathing systems for decompression purposes
40.60 Close of voting