Bulgarian Institute for Standardization
Standards – always a step ahead
Phone: +359 2 8174 523, +359 2 8174 504
E-mail: info@bds-bg.org
1797 Sofia, 13 "Lachezar Stanchev" Str., "Izgrev" Complex
ID number: 175079183, VAT number: BG175079183
Main menu

Projects and standards

To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.

Wind energy generation systems - Part 21-6: Test procedures for grid adaptability of wind turbines

10.20 New project ballot initiated

TC 88 more

Joint commissioning for grid-connection of offshore wind farms via VSC-HVDC transmission

10.20 New project ballot initiated

TC 8/SC 8A more

IEC TR 62500 Ed.1 Process management for avionics- Defining and performing highly accelerated tests in aerospace systems - Application guide

20.99 WD approved for registration as CD

TC 107 more

PACKAGING OF COMPONENTS FOR AUTOMATIC HANDLING –<br /> <br /> Part 3-3: Packaging of surface mount components on continuous paper tapes for Auto Loading Feeder

00.99 Approval to ballot proposal for new project

TC 40 more

PACKAGING OF COMPONENTS FOR AUTOMATIC HANDLING –<br /> <br /> Part 3-4: Packaging of surface mount components on continuous embossed tapes for Auto Loading Feeder

00.99 Approval to ballot proposal for new project

TC 40 more

IEC60191-6-23 Ed.1.0 :Standardization roadmap for fan-out packages

00.99 Approval to ballot proposal for new project

TC 47/SC 47D more

PRINTED BOARDS AND PRINTED BOARD ASSEMBLIES– DESIGN AND USE - Part 8: 3D shape data for CAD component library

00.99 Approval to ballot proposal for new project

TC 91 more

<p>Smart Manufacturing Standards Map (SM2) Framework</p>

00.99 Approval to ballot proposal for new project

SyC SM more

Haptics

00.99 Approval to ballot proposal for new project

TC 100 more

Fuel cell technologies - Part 7-2: Test methods - Single cell and stack performance tests for solid oxide fuel cells (SOFC)

00.99 Approval to ballot proposal for new project

TC 105 more

RESIN BASED REACTIVE COMPOUNDS USED FOR ELECTRICAL INSULATION –Part 3: Specifications for individual materials Sheet 8: Resins for cable accessories

00.99 Approval to ballot proposal for new project

TC 15 more

Switches for appliances - Part 1: General requirements

00.99 Approval to ballot proposal for new project

TC 23/SC 23J more

Test method of sound variation detection sensors for fire detection

00.99 Approval to ballot proposal for new project

TC 47/SC 47E more

CONNECTORS FOR ELECTRONIC EQUIPMENT PRODUCT REQUIREMENTS Part 8-10X: Power connectors – Detail specification for 2-pole snap locking power rectangular connectors with plastic housing for rated current of 63 A

00.99 Approval to ballot proposal for new project

TC 48 more

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – CONNECTOR OPTICAL INTERFACES – Part 2-1: Connection of 50/125 µm, graded index multimode non-angled physically contacting fibres

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

Thermal Endurance Test Method for Flexible Optic-Electric Circuit

00.99 Approval to ballot proposal for new project

TC 91 more

Guidelines for 48V ELVDC Distribution System

00.99 Approval to ballot proposal for new project

SyC LVDC more

Systems Reference Deliverable (SRD) - CITY SERVICE CONTINUITY – IMPLEMENTATION GUIDELINE AND CITY SERVICE CASES

00.99 Approval to ballot proposal for new project

SyC Smart Cities more