To find easily the necessary information, use the different options for advanced search below, e.g. search by technical committee; by keyword in Bulgarian/English; by reference and others.
Gullies for buildings - Part 6: Trapped floor gullies with a depth of water seal less than 50 mm
60.55 Ratification completed (DOR)
Gullies for buildings - Part 7: Trapped floor gullies with mechanical closure
60.55 Ratification completed (DOR)
Gullies for buildings - Part 8: Trapped floor gullies with combined mechanical closure and water seal
60.55 Ratification completed (DOR)
Flanges and their joints - Dimensions of gaskets for Class-designated flanges - Part 1: Non-metallic flat gaskets with or without inserts
40.20 DIS ballot initiated
Artificial climbing structures - Part 4 - Safety requirements and test methods for safety surfaces
10.99 New project approved
Soil improvers and growing media - Determination of a quantity
60.55 Ratification completed (DOR)
Child care articles - Soother holder - Safety requirements and test methods
45.99 Dispatch of FV draft to CCMC
Bitumen and bituminous binders - Preparation of test samples
20.60 Close of comment period
Bitumen and bituminous binders - Determination of kinematic viscosity
45.99 Dispatch of FV draft to CCMC
Bitumen and bituminous binders - Determination of dynamic viscosity by vacuum capillary
45.99 Dispatch of FV draft to CCMC
Bitumen and bituminous binders - Determination of the resistance to hardening under influence of heat and air - Part 1: RTFOT method
20.60 Close of comment period
Unplasticized poly(vinyl chloride) (PVC-U) profiles for the fabrication of windows and doors - Classification, requirements and test methods - Part 2: PVC-U profiles covered with foils bonded with adhesives
40.60 Close of voting
Surfaces for sports areas - Test methods for the determination of vertical water infiltration and horizontal water flow rates
60.55 Ratification completed (DOR)
Machinery for supply and circulation of liquid coating materials - Safety requirements
45.99 Dispatch of FV draft to CCMC
Liquid petroleum products - Determination of total contamination - Part 1: Middle distillates and diesel fuels
40.20 DIS ballot initiated